Terracon meets you wherever you’re at within the lifecycle of your project.
Wherever you are in your project, we’re ready to meet you there.
Our employee-owned company is rooted in caring, excellence, and integrity on behalf of our clients, partners, and communities.
We’re explorers on a mission to transform our industry and the world around us.
We are a team that rewards innovation and curiosity, built on a culture of excellence and caring. Here are some of our stories.
Here's the latest updates and information about our company, projects, people, and charitable foundation.
See how we’re helping clients, start to finish and coast to coast
November 19, 2026
All News and Events, Geotechnical, Projects, Stories, Transportation / Infrastructure
Arizona Department of Transportation (ADOT)
Phoenix metropolitan area
The I-10 Broadway Road Curve project transformed approximately 12 miles of interstate through the Phoenix metropolitan area, where congestion had long been part of everyday travel for commuters, visitors, and commercial traffic. The improvements included new general-purpose, HOV, and collector-distributor lanes, along with 21 new bridge structures and about 80 retaining walls.
Delivering a project of this scale through design-build meant design and construction moved quickly and often overlapped. Geotechnical work was critical from the start: design plans could not be submitted until the necessary geotechnical work was complete. Structural teams needed subsurface information and recommendations before bridge and wall design could move forward, making timely, reliable geotechnical guidance essential to the schedule.
Ground conditions also varied considerably along the corridor. Some parts had dense sand, gravel, and cobbles, while others transitioned to comparatively weaker clays and sands. Understanding those differences was key to recommending foundations suited to the conditions beneath each structure.
Terracon served as the geotechnical engineering designer, exploring subsurface conditions and developing the engineering parameters and recommendations needed to support design. That work started well before the first project boring.
Terracon compiled previous geotechnical information, including internal project data from previous Terracon projects in the area and ADOT records. The team used that knowledge to anticipate subsurface conditions and develop preliminary foundation concepts, then used field exploration to confirm conditions, refine geotechnical parameters, and finalize recommendations.
“If you assume weak soils everywhere, you’re going to plan for larger foundations. On a project with this many structures, that can add up quickly,” said Ramon Padilla, P.E., geotechnical project manager.
The resulting recommendations reflected the range of conditions across the corridor. Of the 21 new bridges, 11 were constructed on drilled shaft foundations, eight on shallow spread footings, and two pedestrian bridges used a combination. Terracon’s engineering also addressed weaker soil layers, potential erosion around bridge foundations at the Salt River, overlapping stresses between new and existing foundations, collapsible soils, and constrained or steep-slope locations.
The completed I-10 Broadway Road Curve improvements added significant capacity along the corridor, including collector-distributor roads that separate entering and exiting traffic from through traffic. For people who had grown accustomed to congestion along this stretch of I-10, free-flowing traffic at peak hours is something they can now experience every day.
The project team’s work also earned industry recognition. The I-10 Broadway Road Curve Improvement Project received a 2025 Grand Award in ACEC Arizona’s Excellence in Arizona Engineering Awards, recognizing the project’s collaboration, innovation, and infrastructure impact across the Phoenix metropolitan area. It also won a 2026 PCI Design award.
Terracon
(800) 593-7777
corporate@terracon.com
Miles of interstate improvements
New bridges
Retaining walls
Terracon was responsive. Whenever I called Ramon or others there, I got a quick response. That was critical to us getting our work done. Josiah RobertsPrincipal project managerTYLin
Terracon was responsive. Whenever I called Ramon or others there, I got a quick response. That was critical to us getting our work done.
We love building our communities and across the country - these stories represent some of our best endeavors.
Projects
Dig Deeper
Logistics Facilities Services Newsletter
Terracon Names Janet Keiser Vice President and National Director for Transportation and Infrastructure
Easing the Way for Distribution Center, Warehouse & Terminal Upgrades