Terracon meets you wherever you’re at within the lifecycle of your project.
Wherever you are in your project, we’re ready to meet you there.
Our employee-owned company is rooted in caring, excellence, and integrity on behalf of our clients, partners, and communities.
We’re explorers on a mission to transform our industry and the world around us.
We are a team that rewards innovation and curiosity, built on a culture of excellence and caring. Here are some of our stories.
Here's the latest updates and information about our company, projects, people, and charitable foundation.
See how we’re helping clients, start to finish and coast to coast
December 28, 2023
Uncategorized
(1) Facility requirements should be verified to confirm due dates(2) Varies by permit.(3) Submit to Ohio EPA on Tier2submit program, submit to FD and LEPC via email or mail.(4) EPA eliminated the de minimis exemption for Supplier Notification Requirements for chemicals of special concern (e.g., lead, mercury, dioxins, etc.)(5) VSQGs or SQGs that for any one calendar month generate 2,200 pounds or more of hazardous waste, must also submit a biennial report (unless an episodic event notice had been submitted).
Stormwater: Complete annual comprehensive inspection and routine facility inspections as needed. Conduct benchmark monitoring and visual monitoring quarterly at each outfall. Conduct training at least annually. Those required to submit Discharge Monitoring Report (DMR) forms must do so within 30 days of sampling.
Hazardous Waste: VSQG/SQG limited to one planned episodic event and one unplanned event per year – no biennial report required if proper notification. SQG/LQG conduct weekly inspections. Verify hazardous waste generator status, review and update contingency plan annually.
Universal Waste: Conduct training annually. Confirm that storage times do not exceed one year.
Wastewater (NPDES/SDS): Discharge reports are required to be submitted at regular intervals, per permit requirements.
SPCC Plan: SPCC Plans must be updated every five years or whenever there is a change in oil storage or spill potential. Conduct and document routine inspections and annual training.
Air Permits/Emission Inventories: Submit all construction permit applications; Title V operating permit applications & modifications; notifications of start of construction and start of operation electronically on Ohio eBiz.
EPCRA TRI: Begin collecting data for RY2024 for reporting over 100 pounds of 189 specific PFAS chemicals (there is no de minimis exemption). See attached link for additional information: https://www.epa.gov/toxics-release-inventory-tri-program/basics-tri-reporting
IndianaMichiganKentuckyWest Virginia
Senior Environmental Engineer(216) 539-4213scott.smith@terracon.com
We love building our communities and across the country - these stories represent some of our best endeavors.
Thought Leadership: People
Dig Deeper
Logistics Facilities Services Newsletter
Terracon Names Janet Keiser Vice President and National Director for Transportation and Infrastructure
Projects
Easing the Way for Distribution Center, Warehouse & Terminal Upgrades