Terracon meets you wherever you’re at within the lifecycle of your project.
Wherever you are in your project, we’re ready to meet you there.
Our employee-owned company is rooted in caring, excellence, and integrity on behalf of our clients, partners, and communities.
We’re explorers on a mission to transform our industry and the world around us.
We are a team that rewards innovation and curiosity, built on a culture of excellence and caring. Here are some of our stories.
Here's the latest updates and information about our company, projects, people, and charitable foundation.
See how we’re helping clients, start to finish and coast to coast
December 5, 2024
Healthcare, Projects, Stories
University Health System (UHS)
San Antonio, TX
University Health Services selected Terracon based on our qualifications to provide special inspections and materials testing services for the new construction of a 302-bed, 12-story 600,000-square-foot tower hospital building. It includes two emergency rooms, a neonatal intensive care unit with a six-story, 900-space parking garage, and an additional shell space for future growth. The tower also includes a dedicated OB/GYN emergency department, private delivery suites, a Level 4 maternity care center, and a Level 4 neonatal intensive care unit.
As the project started, the contractor encountered some earthwork challenges during the parking garage foundation installations.
During the drill pier installation for the tower side of the building, voids were encountered on the walls of the pier excavation which led to water logging in the pier excavation. In addition, the voids had to be evaluated for karst features.
In collaboration with the design team and contractor, Terracon was able to provide engineering recommendations. While we were not the geotechnical engineer of record for this project, one of our department managers was on the job site, evaluated the earthwork issues, and gave the construction team recommendations and direction for earthwork issues.
For the drilled pier concerns, our team provided an innovative idea to be able to repurpose a borehole camera for data collection purposes at the bottom of the drilled shaft walls.
Once the camera was lowered down into the pier, the side walls could be evaluated in their current condition, identify the scope of the void, and evaluate the sloughing.
The building structure consists of slab on grade, with column loads supported by drilled piers, and post-tensioned elevated decks with concrete shear walls. Site work included utility trench backfill, miscellaneous flatwork, sidewalks, and testing and observations for a soldier pile retaining wall system with soil nails.
Materials testing services provided consisted of the following:
Terracon also performed vibration and noise monitoring of the existing adjacent hospital which remained in operation during the construction.
Working closely with UHS and the program manager, The Broaddus Companies, Terracon was able to implement the following cost-saving methods:
With these methods, we came in $600,000 under the projected budget.
The collaboration with the management firm went so well, they have referred us to multiple other health care projects.
“They were really happy to have worked with us,” said project manager Eliud Gutierrez. “They were more than willing to come back and work with us again.”
Contact
(800) 593-7777
corporate@terracon.com
We love building our communities and across the country - these stories represent some of our best endeavors.
Thought Leadership: People
Dig Deeper
Logistics Facilities Services Newsletter
Terracon Names Janet Keiser Vice President and National Director for Transportation and Infrastructure
Projects
Easing the Way for Distribution Center, Warehouse & Terminal Upgrades