Gila to Citgo Transmission LineGeolocation: 27.8161, -97.4147

Terracon provided environmental consulting services for American Electric Power (AEP) related to the installation of new 138kV electric transmission and fiber optic cables between the Gila Substation and transition structures at the CITGO refinery in Corpus Christi, Texas. The project involved horizontal directional drilling (HDD) techniques under the Ship Channel.  Project tasks included the removal of an existing high-pressure fluid-filled (HPFF) cable and the abatement and demolition of an existing Pump House at the Gila Substation.  There were a number of special requirements related to the jobsite, which is immediately adjacent to the Corpus Christi Ship Channel on one side and Nueces Bay on the other, both environmentally sensitive areas.  During construction, Terracon also provide on-site environmental monitoring using field instrumentation and sampling techniques. Potential contaminants of concern included TPH, metals, PCBs, Silicone Oil, VOCs, lead-based paint and asbestos.

Corpus Christi, TX 78407

Services

Environmental

Associated Office


Corpus ChristiGeolocation: 27.6991, -97.4214
Eager to help assist in the continuous growth of the region, Terracon has opened a Corpus Christi office to meet the needs of our existing clients and reach potential clients throughout Texas. We pride ourselves on our commitment to further better communities by combining our national resources with specific local area expertise to assist in key developments. This office provides environmental, facilities, geotechnical, and materials testing services serving a diverse set of markets including transportation, federal and local government, energy, oil and gas, commercial/retail, and…