Projects


Saint Francis HospitalGeolocation: 41.7637, -72.6851

John T. O'Connell Tower Addition Terracon was hired by Saint Francis Hospital and Medical Center to provide construction materials testing services for an approximately 318,000 s.f., ten-story addition to the facility. Our materials testing services included review of H-pile installation, earthwork activities, concrete placements, masonry construction, structural steel and cold-formed steel erection, and structural steel plant inspections in both the United States and Canada. During the excavation phase of the project an adjacent five-story brick structure, which was being underpinned, settled approximately 1 to 2 inches. Terracon engineers were immediately called into monitor settlements, and measures were taken to stabilize the existing structure.

Hartford, CT

Services

Associated Office


HartfordGeolocation: 41.6466, -72.6358
Terracon's Hartford office was formerly JGI Eastern, Inc., a 21-year-old company with offices in Hartford, CT, Scarborough, MA, and Manchester, NH, when it was acquired by Terracon in 2007. The Hartford office offers a comprehensive range of services in the fields of environmental and geotechnical engineering, hydrogeology, and construction monitoring and testing. We currently have around 50 employees at the Hartford location.