Projects


Miyamura High SchoolGeolocation: 35.5281, -108.7426

Terracon provided geotechnical subsurface evaluation and subsequent report with recommendations for geotechnically related design and construction. The project included demolition of 111,000 square feet of existing buildings to be replaced by a new one- and two-story, 189,000 square-foot educational building. Structural renovations of the existing gymnasium and cafeteria buildings are also part of this project.

Gallup, NM

Services