Projects


Interstate 29, Segment 2Geolocation: 42.4921, -96.4247

Terracon was retained by Howard R. Green Company, the prime civil design and engineering firm for the project to perform drilling, laboratory testing, and geotechnical engineering services for the Interstate 29, Segment 2 project. The project consists of preliminary design for reconstruction of about 3.6 miles of Interstate 29 near Sioux City, Iowa. The primary goal of this project is to widen the interstate and reconstruct bridges and interchanges. Approximately 7 dual bridges and 8 ramp or side road bridges will be reconstructed along with 5 interchanges and associated side roads, braided ramps, and retaining walls.

Sioux City, IA

Services

Associated Office


Sioux CityGeolocation: 42.5207, -96.367
Terracon's Sioux City office was founded in 2006. The office currently has five employees offering geotechnical consulting, environmental assessment, and construction materials engineering and testing services. The Sioux City office has worked on projects that include providing material lab testing, drilling and geotechnical engineering for highway construction. They are available for foundation testing, cement engineering and many other services.