Interstate 10 WideningGeolocation: 30.5694, -91.0969

Interstate 10 is being widened from two lanes in each direction to three lanes in each direction with a 54-inch high center median single barrier or double barriers. Dual existing bridges over Wards Creek Diversion will also be widened. The bridge replacement is complicated by the extreme skew of the bridges to the Kansas City railroad track and the existence of a major high voltage electrical transmission line along the tracks with a pole located between the bridges that must remain in place. Terracon has been retained as the quality control firm for this Design-Build project under Boh Brothers Construction Co., LLC, providing certified engineering inspections during construction. Services performed to date have included preparation and upkeep of construction quality control plan, oversight of patching, and inspection of concrete placement.

East Baton Rouge Parish, LA

Services

Associated Office


Baton RougeGeolocation: 30.4279, -91.0076
The Baton Rouge office is an evolution of a geotechnical and geoenvironmental practice started more than 25 years ago. In 1985, Victor Donald, P.E., joined Ware Lind Engineers to start its first branch office. Ware Lind was a geotechnical engineering firm established in 1961 in Jackson, Miss. Taking a 12-month lease in a 1,500 square foot office warehouse, the office grew to more than 30 staff within five years. In the early 90s the firm became Aquaterra Engineering, Inc., as a result of an acquisition by a Fortune 500 company. From the time of this acquisition until 2000, the firm performed…