Projects


Galt House Parking GarageGeolocation: 38.2527, -85.7585

 Galt House.jpg

The Galt House Parking Garage is a new eight-story post tension cast-in-place parking garage approximately 234,500-square-foot in size. The new parking garage was supported on 18" diameter 125-ton capacity auger-cast piles. A steel connector bridge was also constructed over 3rd Street connecting to the new University of Louisville Yum Center basketball arena. Services provided by Terracon included value engineering to shorten the original pile design prepared by others. This was confirmed by field load testing prior to installation of more than 500 auger cast piles. Other Special Inspections services included field monitoring and testing of post-tension cables for the parking garage.

Louisville, KY

Services

Associated Office


 Clark Regional
LouisvilleGeolocation: 38.2491, -85.5105
Terracon's Louisville office has been in operation since 1999. Our services include geotechnical services, condition surveys, forensic engineering, environmental services including Phase I and Phase II environmental site assessments, limited site investigations, and site remediation services including design of soil vapor systems and site cleanup. The Louisville office also provides Special Inspections and construction materials engineering and testing on various public and private construction projects.