Ash Grove Cement 4,650 TPD ModernizationGeolocation: 33.7218, -94.3969

 ash grove.jpg

Terracon provided geotechnical engineering services for AshGrove Cement Company's new 4,650 standard ton per day modernization of their existing facility. The project is a $190 million, high-profile, state-of-the-art cement processing plant that includes constructing a new cement kiln, cement mill and raw and finished material storage structures.

Terracon performed three subsurface explorations involving soil drilling through fill and native soils, coring in marl/limestone and test pits to evaluate on-site soils for use as fill. Pressuremeter testing was performed in the marl bedrock, which resulted in using a significantly increased bearing pressure in pier foundation design and reduced construction cost estimates. Terracon also provided civil grading design assistance, drilled pier foundation analyses and rock excavation slope design services. During construction, Terracon provided testing and observation services.

Foreman, AR

Services

Associated Office


 Heifer building.jpg
Little RockGeolocation: 34.638, -92.4501
Terracon's Little Rock office opened its doors in 1993 as Genesis Environmental Consulting, Inc., with a primary focus in solid waste engineering services. After acquisition by Terracon in 2004, Little Rock has grown from 20 to 38 employees. While many of our environmental services remain the same today as they were in 1993, the office has now become more diversified with expertise in many areas. With more than 27 years of experience in Arkansas, our employees are extremely knowledgeable about environmental policies, regulations and concerns, construction materials procedures and codes, and…