Terracon opened its doors in Lincoln in 1991. Since then they have served the Lincoln area with geotechnical engineering, construction material evaluation and environmental assessment for construction and remediation projects. Terracon has performed subsurface investigations and in-situ testing, soil sampling, foundation and structural consulting and more. For geotechnical, environmental and materials help with your project, contact the Lincoln office of Terracon.

3220 N. 20th St., Suite 3
Lincoln, NE 68521

Phone: (402) 466 3911
Fax: (402) 466 0811

Services

Environmental
Geotechnical
Materials

Contacts

Brad Levich, P.E., Office Manager

Key Projects


Harris OverpassGeolocation: 40.8069, -96.6817
In 2004, the City of Lincoln began evaluating the replacement of Harris Overpass located in the Haymarket area of downtown Lincoln. Terracon was retained to perform geotechnical and environmental services for the bridge currently being constructed. At the initial phase of the project, Terracon conducted environmental sampling and analysis of soils in conjunction with a geotechnical exploration for the proposed bridge overpass in order to assess for chemical contaminant impact to soil at the proposed pier locations. The geotechnical exploration was conducted to provide recommendations…

Ken Morrison Life Sciences Research CenterGeolocation: 40.8069, -96.6817
Terracon was retained by the University of Nebraska at Lincoln to perform geotechnical engineering services for the $21-million, 74,000 square-foot Ken Morrison Life Sciences Research Center on East Campus in Lincoln, Neb. The geotechnical exploration included general subsurface conditions encountered in the borings, the analysis and evaluation of test data, and recommendations regarding the design and construction of foundations and related site development. The geotechnical investigation indicated varying depths of existing fill underlain by lean to fat clay and glacial till soils.…

North Stadium RenovationsGeolocation: 40.8069, -96.6817
In 2003, the University of Nebraska at Lincoln (UNL) began a $40-million renovation of the north end of Memorial Stadium. Terracon was retained by the UNL to perform geotechnical, construction materials engineering and testing, and IBC Special Inspection services for the project. Terracon's services included extensive subsurface investigations using both conventional soil borings and advanced in-situ cone penetrometer soundings, analysis and evaluation of test data, and geotechnical engineering recommendations regarding the design and construction of foundations and related site…